Axis T99A11 Guia De Instalacion página 21

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 129
AXIS T99A11 Positioning Unit 24 V AC/DC
1
Power cable (not included)
2
Strain relief
3
Grounding screw
4
Grounding braid (not included)
5
Bottom cable hole
1. Install the optional conduit adapters (not included).
2. Connect the grounding braid to the grounding screw.
3. Insert the power cable, I/O cable and network cable through the hole in the base unit as
shown in the illustration above. Alternatively insert them through the bottom cable hole.
4. Insert the power cable through the strain relief with a distance of 530 mm (21 in) from
the strain relief to the end of the cable.
21
EN

Publicidad

Tabla de contenido
loading

Tabla de contenido