Towing Products 26102 Instrucciones De Instalación página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

2. Drill (2) 7/16" holes in each side of the frame where the punched center marks were made. The use of a center drill or small
pilot hole may be very helpful prior to final drilling.
3. Install (2) supplied ½-13 Thread Forming Screws (Item 3, figure 1).
Repeat for opposite side and torque (4) ½-13 Thread Forming Screws to 50 ft-lb.
4. Install ½-13 Hex Nut (Jam Nut) onto the ½-13 X 3 ½" Square Head Bolts and Install into the frame brackets as shown in figure 11.
Figure 11
FLANGE HEAD,
THREAD
FORMING
SCREWS
5. Tighten the Set Screw until it contacts the trailer frame. Then proceed to tighten ¼ to ½ turn (DO NOT OVERTIGHTEN SET
SCREW). Tighten the Jam Nut preventing the set screw from backing out while in use. Repeat for other side of trailer frame.
6. Remove C-Clamps from frame.
C-CHANNEL DUAL CAM HP FRAME PLATE INSTALLATION
NOTE: Some C-Channel frames may have square outside corners that do not allow the frame plate to contact the
bottom of the frame. For these type of frames a ½" flat washer (Not Supplied) is required between the outside of the
trailer frame and the frame plate. The bottom of the frame plate MUST contact the bottom of the trailer frame.
1. With the C-clamps still in place, center punch (2) holes in the frame for each bracket.
2. Drill (2) 17/32" holes in each side of the frame where the punched center marks were made. The use of a center drill or small
pilot hole may be very helpful prior to final drilling.
3. Install the (2) supplied ½-13 x 1 ½" Bolts, ½" Lock Washers & ½" Nuts (items 5,6 & 7) figure 13.
Repeat for opposite side and torque (4) ½-13 Bolts to 85 ft-lb.
Install ½-13 Hex nuts onto the ½-13 X 3 ½" Square Head Bolts and
4.
install into the frame brackets as shown in figure 13.
5.
Tighten the Set Screw until it contacts the trailer frame.
Then proceed to tighten ¼ to ½ turn (DO NOT OVERTIGHTEN SET SCREW).
Tighten the Jam Nut preventing the set screw from backing
out while in use. Repeat for other side of trailer frame.
6. Remove C-Clamps from frame.
©
2010 Cequent Performance Products, Inc.
Installation Instructions
Dual Cam HP
High-Performance Sway Control
Figure 13
HEX HEAD
BOLT
Sheet 7 of 33
SET SCREW
JAM NUT
FRAME
BRACKET
JAM
NUT
NUT
26102IN
04/29/14
Form: F205 Rev A 5-6-05
SET
SCREW
LOCK WASHER
Rev. K

Publicidad

Tabla de contenido
loading

Productos relacionados para Towing Products 26102

Tabla de contenido