Descargar Imprimir esta página

Cooper PORTFOLIO Instrucciones De Instalación página 2

Luminaria de montaje en techos y de la luminaria downlight de iluminación directa de superficie

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions – Ceiling Mounted Fixture and Surface Downlight
Surface Downlight
TN MNuno CanNpy Asstmbly
1.
Make wiring connections.
2.
Secure canopy assembly to the outlet box with screws.
TN Adjuso SNckto PNsioiNn
The appropriate socket position is obtained by
simultaneously depressing both spring projections on the
sides of the socket assembly and engaging the appropriate
slot.
TN Insoall HNusing
The housing is attached to the mounting canopy assembly
by screws. (Figure 2.)
Figurt 2.
2
TN Insoall Trim
Trims are secured to the socket assembly via keyhole slots
and screws.
TN Cltan Trims
First, gently wipe with a soft, clean, dry lint-free cloth to
remove loose dust. Then, use mild detergent solution on a
soft clean cloth to remove finger prints and stains. Rinse
with clean, soft water and dry with lint-free cloth.
Canopy Assembly
Housing
Trims
InsoallaoiNn InsorucoiNns – Ctiling MNunotd Fixourt and Surfact DNwnligho
IB520049ML
www.cooperlighting.com

Publicidad

loading