TP-Link CAP300 V1 Guia De Instalacion página 12

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 15
English
3
Secure the mounting bracket to the ceiling tile
using three M3x30 pan-head screws, washers
and wing nuts�
4
Feed the Ethernet cable through the hole and
set the ceiling tile back into place�
5
Connect the Ethernet cable to the ETHERNET
port� Attach the EAP/CAP to the mounting
bracket by aligning the arrow mark on the EAP/
CAP with the arrow mark on the mounting
bracket, then rotate the EAP/CAP until it is
locked into place�
■ Option3: Wall Mounting
Follow the steps below to install the EAP/CAP with the provided accessories:
M3×28 Plastic Wall Anchors
10
(Qty.3)
M3×20 Self-tapping Screws
(Qty.3)

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Cap1200 v1

Tabla de contenido