1. Preparation
Install the water supplies and drain piping according to the
roughing-in information.
Cut out the template where indicated for the countertop opening.
Cut along the inside of the cutting line.
Fold the template along the dotted line and position on the
countertop with the short flap hanging over the front of the
counter.
Verify cabinet clearance beneath the countertop.
Trace around the template on the countertop with a pencil.
Measure the front lip thickness "A" of the cabinet. See the
illustration.
Draw a straight line parallel to the front edge of the countertop
the same distance in as the lip thickness.
Kohler Co.
A
A
3
Pencil
Line
1085573-2-A