MAINTENANCE
6.
7.
8.
9.
10. Press and hold the Off
11. Switch all EBC240 circuit breakers to the OFF (O) position.
12. Unplug the EBC240 battery output cord from the battery connector
13. Replace the EBC240. See "Recycling the Used Battery or UPS" on
14. Install the new EBC240. See "Installing the EBC240" on page 17.
15. Switch all battery circuit breakers to the ON (
16. If you shut down the UPS, connect utility power to the UPS.
17. Start the UPS by pressing the On button.
18. If you bypassed the UPS power with the PPDM, turn the bypass
19. The bar graph indicators display the percentage of load being
24
Avaya EBC240 Site Preparation, Installation and Operator's Manual
Disconnect utility power from the UPS; the UPS shuts down in
five seconds.
The bar graph and battery indicators flash briefly prior to shutdown.
Proceed to Step 12.
Remove the PPDM front cover.
Turn the bypass switch on the PPDM to the BYPASS position. The
PPDM is now powering your equipment from utility power.
approximately three seconds. The UPS transfers to Standby mode.
on the UPS rear panel.
page 25 for proper disposal.
μ
The
indicator flashes, indicating the UPS is in Standby mode
with the equipment offline.
switch on the PPDM to the NORMAL position and reinstall the
PPDM front cover.
applied to the UPS. The UPS is now in Normal mode and supplying
power to your equipment.
button on the UPS front panel for
|
) position.
S
164201531 Rev C