New Construction Installation Instructions - Homewerks 299650 Manual

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

NEW CONSTRUCTION INSTALLATION INSTRUCTIONS

BEFORE INSTALLATION
WARNING: RISK OF ELECTRIC SHOCK. Ensure the electricity to the
wires you are working on is shut off. Either remove the fuse or turn
off the circuit breaker before removing the existing bath fan or installing
the new one.
1.
Attach duct connector to the fan housing as shown in the
drawing.
2.
Place the fan housing next to a ceiling joist or wall stud.
The fan housing should be level and perpendicular to the
joist or stud. Allow for thickness of ceiling board used in
your application. DO NOT flush mount to joist.
Bottom of fan housing should be flush with ceiling board.
3.
Mount the fan housing to the joist using the wood screws
(included) where indicated.
1
2
3
6
HomewerksWW.com

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido