Electric Pump - CEMO DT-Mobil CUBE 650 l Guia De Inicio Rapido

Ocultar thumbs Ver también para DT-Mobil CUBE 650 l:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 14
GB
Electric pump 12 V / 24 V
a Mount the pump with pump base.
b
b Mount the pump on the pump support with:
4 x hex nut M6
4 x spring washer A6
4 x washer A6.4
c Remove the protective cap on the delivery hose
and on the pump. Mount the fitting with seal on the
suction side of the pump.
d Remove the protective cap on the connecting line.
Mount the filler hose with delivery nozzle on the
connecting line/spacer.
6
a
c
d
Electric pump 12 V / 24 V
a Mount the pump with pump base.
b
b Mount the pump on the pump support with:
4 x hex nut M6
4 x spring washer A6
4 x washer A6.4
c Remove the protective cap on the delivery hose and
on the pump. Mount the fitting with seal on the suction
side of the pump.
d There is no spacer on the connecting line.
e
e Mount the meter on the connecting line.
f Mount the filler hose with outlet manifold on the meter.
with meter
a
d
c
f

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Dt-mobil cube 980 l

Tabla de contenido