Preparation; Assembly Or Installation Instructions - ED 1656FC-24-241 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PREPARATION

Before beginning assembly of product, make sure all parts are present. Compare parts with
package contents list and hardware contents list. If any part is missing or damaged, do not attempt
to assemble the product.
Estimated Installation Time: 30 minutes.
Tools Required for Installation (not included): Phillips screwdriver, utility knife or scissors,
power drill with drill bit.
Helpful Tools (not included): Measuring tape, level
INSTALLATION INSTRUCTIONS
Note: This floor cabinet comes with two
different door and drawer handle options.
1. One set of handles (BB) is attached to the
inside of the door/drawers (D & E), and the
other set is packaged separately inside. Use
the attached string to open the drawers initially.
Unscrew the handles (BB) and attach your
preferred handles to the outside of the
door/drawers, as illustrated in the diagram.
Hardware Used
Handle
BB
2. If the location you will be installing the floor
cabinet has baseboard molding, proceed to
Step 3.
If the location you will be installing the floor
cabinet does not have baseboard molding,
unscrew and remove the wall mounting spacer
bar (B) from the back of the cabinet before
proceeding to Step 3.
1
1
x 5
2
6
A
D
E
E
E
E
2
B
A
3
BB

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

1656fc-24-247

Tabla de contenido