G Belt Installation
The conveyor belt has been cut to the proper length and
lacing installed at the factory. Before attempting to install
the belt, its top and bottom sides must be determined. One
side of the belt is "bareback" or rough and the other side is
poly-vinyl impregnated and shiny. The belt should be
installed with the shiny side up.
To install, thread belt under the guards and through the
conveyor as shown in Figures 8A and 9A. Pull belt ends
together and insert that lacing pin (Fig. 8B).
FIGURE 8A
FIGURE 8B
WIDTH
(ANCHO
DE BANDA)
04"-10"
12"-20"
22"-60"
8
BELT
LACING
ANGLE
(ANGULO
DE ENLACE)
10
5
Square
(Recto)
G Instalación de la Banda
La banda del transportador ha sido previamente cortada y
enlazada en la fábrica. Antes de instalar la banda se debe
determinar la parte superior e inferior. La parte brillante
(de poly-vinyl) es la parte superior mientras que la áspera
es la inferior. La banda se colocará con la parte brillante
hacia arriba.
Para instalar, coloque la banda debajo de las guardas y a
través del transportador (Fig. 8A y Fig. 9A). Junte los
extremos e inserte el pasador (Fig. 8B).