Nipple
3-7/8"
(9.8 cm)
Nipple
7"
(17.8 cm)
2. Install the Spout
Remove the temporary nipple.
If you are installing the standard spout, apply thread sealant and
install a 1/2" NPT nipple, extending 3-7/8" (9.8 cm) beyond the
finished wall, to the bath elbow.
If you are installing the 8" (20.3 cm) spout, apply thread sealant
and install a 1/2" NPT nipple, extending 7" (17.8 cm) beyond the
finished wall, to the bath elbow.
Apply a bead of plumbers putty or other sealant to the back of
the escutcheon according to the manufacturer's instructions.
Apply thread sealant to the nipple, and install the spout to the
nipple.
Carefully tighten with a clean strap wrench.
Remove any excess putty.
Kohler Co.
Apply plumbers
putty.
Standard
Length
Spouts
Apply plumbers
putty.
Large Spouts
3
1011610-2-B