Tools Required; Pre-Installation Requirements - Rampage Trailview Tonneau Top Instrucciones De Instalación

Ocultar thumbs Ver también para Trailview Tonneau Top:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Contents cont.
NOTE: Actual product may vary from illustration.
LH Upright Lower
RH Upright Lower
Plastic x1
Self Tap Screw x28
Upright Turn Knob x2
LH Front Plastic x1
Door Surround Knob -
Door Surround Knob -
Long x2

Tools Required

Phillips Screwdriver

Pre-Installation Requirements

• Remove existing hard or soft top. For OEM (original/factory) soft tops, also remove:
• Windshield header bar
• Tube frame hardware from roll bar
• Side door surrounds
• Rear window, tailgate bar, tailgate clips
• For correct installation, mounting surface of part should be between 70-95° F (21-35° C) prior to installation.
LH Upright x1
Plastic x1
Door Surround
Bracket Front x2
RH Front Plastic x1
LH Rear Door Bar x1
Door Surround Knob -
Med x2
Ratchet and extensions
RH Upright x1
Door Surround
Bracket Rear x2
RH Rear Door Bar x1
Front Latch x2
Small x2
Torx Bit
T25
2
LH Upper Corner
Plastic x1
LH Front Door Bar x1
RH Front Door Bar x1
Top Retention Strap x1
Shoulder Bolt x2
Tonneau Support x1
Allen Wrench
RH Upper Corner
Plastic x1
nut x2
Safety Glasses

Publicidad

Tabla de contenido
loading

Tabla de contenido