0701 221.book Seite 15 Mittwoch, 2. Juni 2010 1:38 13
Draining the condensation
– Caution! The compressed air reservoir 17 is un-
der pressure. Place a collecting vessel under-
neath. Carefully open the condensation water
drain cock 19 on the base of the compressed air
reservoir by making a 1/2 turn and drain the
condensation.
– Check the condensation level regularly in the
transparent container of the pressure reducer 21.
It must not exceed the upper marking. For drain-
ing the condensation, the knob located on the un-
derside of the pressure reducer must be opened
a 1/2 turn under pressure.
Oil change (except oil free)
– As a basic rule the oil change should be carried
out under hot-running conditions.
– Place the collecting vessel underneath and open
the oil drain plug 10. Caution! Danger of burn-
ing from the hot oil!
– Close the oil drain plug 10 and fill up with oil of
class ISO 100 through the oil filler opening 9.
Never mix different oils.
Maintenance intervals
Care
- clean the cooling fins of
Screwing connections
- tighten once after 50
Checking the oil level
- daily, or before each
Changing the oil
-for the first time after 5
- regularly after 100
Draining the
- at least weekly
condensation
- if required, daily
Checking the intake
- weekly
filter
Cleaning the intake
- monthly, and more
filter
Changing the intake
- if extremely dirty or
filter
Cleaning the non-return
- every 2 years
valve
Recommended check
-
according to pressure
reservoir instructions
-
If the machine should fail despite the care taken in
manufacturing and testing, repair should be carried
out by a Würth MasterSERVICE agent.
For all correspondence and spare parts orders, al-
ways include the article number on the type plate of
the machine.
For the current spare parts list of this machine, log
into the Internet under "http://www.wuerth.com/
partsmanager" or ask for a copy at your nearest
Würth branch office.
the cylinder and
pressure lead 2
regularly; clean the
manometer sight
glasses
hours of operation
use
hours of operation
hours of operation,
however, at least once
every 6 months
often if exposed to
large amounts of dust
damaged
Warning! discharge the
reservoir pressure!
every 5 years - internal
check
every 10 years -
pressure check
15