Huskie Tools 45202 Manual De Instrucciones página 6

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation (continued)
4
Install vertical J-trims
□ Cut the remaining J-Trim (B) into two – 48
□ Overlap the vertical J-trim over the horizontal J-trim and secure at the bottom by fastening into the studs using screws (BB).
□ The wide side should fasten to the wall as shown in inset A.
□ Fasten into the stud using one screw (BB) at the top of the trim as indicated by arrows below.
□ Measure the distance between left and right edges to confirm that the distance between them is 96 in.
5
Install first panel
□ Insert one side of the first panel (A) into the vertical J-trim (B) at one side.
Curve the panel slightly to insert into the J-trim (B) at the other side.
□ Ensure the panel (A) is seated into the horizontal J-trim (B) and is level. Using screws (BB),
fasten through the screw channel of the panel into each stud as marked, every 16 in.
□ The first and last screw in each panel should secure the panel and the trim to the stud.
NOTE: Do not drive screw through the hook channel.
in. pieces.
1
2
A
DO NOT SCREW HERE
6
x 2
B
x 7
BB
Screw here
Hook channel
x 4
BB
x 1
A

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido