Samsung FlexDry DVEG60A9900 Serie Manual Del Usuario página 30

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation
STEP 6 Power on (for gas models)
Make sure all gas connections, the exhaust line, and all wiring is connected correctly. Then, plug the power
cord into a power source and check the dryer's installation and operation using the final checklist in Step 7.
STEP 7 Final Check
When installation is complete, confirm that:
• The dryer is plugged into an electrical outlet and grounded properly.
• The exhaust ductwork is connected, and the joints are taped.
• You have used rigid or stiff-walled flexible metal duct material, not plastic flexible duct.
• The dryer is level and is sitting firmly on the floor.
• The dryer starts, runs, heats, and shuts off properly.
• The gas is supplied properly with no leaks (For gas models only).
CAUTION
The burner may not ignite initially due to air in the gas line. Allowing your dryer to operate on a heat setting
will purge the line. If the gas does not ignite within 5 minutes, turn your dryer off and wait 5 minutes. Be
sure the gas supply to your dryer has been turned on. To confirm gas ignition, check the exhaust for heat.
30
English
Untitled-5 30
2021-05-25
5:20:39

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Flexdry dve60a9900 serie

Tabla de contenido