Reliable Tandem Pro 2000CV Manual De Instrucciones página 14

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Pressure Gauge
A pressure reading gauge is present
on the control panel.
0–4: minimum/medium pressure.
4–6: medium/maximum pressure.
6–8: maximum pressure.
8–10: Over-pressure
Open the latch of the hose inlet, on
the machine front, and connect the
hose making sure that it is properly
connected (Fig. 13).
Insert and connect the other end of
the hose in the vacuum inlet (Fig. 14).
To move the machine push from back-
ward as shown in (Fig. 15).
FIRST FILL-UP
If the boiler and water tank are completely empty, all system functions are
disabled.
Ensure there is water in the tank, and manually fill if empty.
With the tank full and the boiler empty, after feeding the generator through
the switches (see the "PREPARATION" paragraph), the system controls the
water filling pump until the correct level is reached in the boiler. In this phase
the heater is deactivated. Once filling is completed, the pump is turned off,
and heating is simultaneously enabled through the boiler heater.
Discharge any residual air from the boiler during the heating stage, by press-
ing switch 2 (Fig. 20) and pressing the steam delivery button 1 (Fig. 20). This
operation is important, given the power of the generator to prevent excessive
rise in pressure.
11

Publicidad

Tabla de contenido
loading

Tabla de contenido