Top Cover
Set Screw
Ground
Bottom Cover
Nut for ground
installation
HINKLEY LIGHTING
33000 Pin Oak Parkway
Screw and spacer
holding down glass
Glass
Threaded Tube
Assembly
Bollard Mount
PVC
Nut
Bottom Plate
Wiring Coupler
Threaded Tube
Avon Lake, OH 44012
Installation Instructions
Family: Dorian | Item No. 15612
Start Here
Unpacking
1. Unpack the bollard and the glass from the box.
2. Remove the bollard mount, threaded tube assembly, and
PVC pipe from the box.
Luminaire Mounting
Note: If your local code requires a frost line burial deeper than 12
inches, you may purchase a 2 inch PVC pipe (sch. 40 or sch. 80) from
a local supplier and cut to length as a replacement to the provided
PVC pipe.
1. Dig a hole about 12 inches or deeper, depending on your
local code.
2. Feed the wires through the PVC pipe and insert it in the ground,
make sure the PVC is sticking out of the ground enough that the
bollard mount will t on top of the PVC, and that the bottom of
the bollard mount is level with the ground.
3. Fill in the hole around the PVC pipe.
4. Level the PVC pipe with a post level.
5. Feed the wires through the bollard mount and the threaded
tube assembly, pull the wires out through the wiring coupler.
6. Put the bollard mount on top of the PVC pipe.
7. Tighten the three set screws on the sides of the bollard mount.
Note: You may set the PVC in cast concrete. It is suggested using
a longer PVC pipe and conduit, that is not provided.
Cut the PVC to height after the concrete is set.
Assembly
1. Wire the xture wires and the main wires together using wire
nuts. Put the silicone glue, that's provided, in the wire nuts to
waterproof.
2. For ground installation: screw the nut (supplied) onto the
threaded tube to get the correct height adjustment. This step is
not needed for concrete or other hard surface installations.
3. Put the main body of the xture over the bollard mount and
threaded tube assembly.
4. Rotate the xture to the desired position.
5. Put the nut (supplied in the parts bag) on top of the threaded
tube and tighten.
6. Unscrew the four screws from the top cover and remove the
cover. Let the cover hang over the edge of the xture.
7. Remove the screws and the spacers for the glass that are in
the xture. Insert the glass into the xture by carefully sliding
them in the channels in the main body. Before inserting the last
piece of glass, place the bottom cover in the xture. Replace
the screws and spacers.
8. Insert a bulb or LED engine. See LED instructions to install.
9. Put the top cover back on and tighten the four screws.
(p)800.442.5539 / (f ) 440.653.5555
www.hinkleylighting.com