Master MCI Manual De Uso Y Mantenimiento página 22

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Place the two side protectors (C) as shown in the following
6
image. Secure them with the help of a No. 6 hex key and the DIN
7380 M8x16 bolts (H), the DIN 125 M8 washers (K) and the M8
hammerhead nuts (N).
8
Place the electrical box as shown in the following image and
9
secure it with the help of a No. 5 hex key, the DIN 7380 M6x10
bolts (I) and the DIN 125 M6 washers (L) to the threaded holes of
leg adjacent to the motor.
Place the conveyor belt next to the bud trimming machine. These
11
should be placed next to each other, keeping a slight space
between them. IMPORTANT: Not leaving a safety margin could
result in scratches and possible damage to the machines.
22
Place the hopper (D) at the end of the conveyor as shown in the
7
125 M4 washers (M) and the DIN 985 M4 self-locking nuts (O) with
Connect the electrical box to the motor.
10
Next, connect one end of the power cable (P) to the connector in
12
the electrical box of the conveyor belt, and the other end to the
electricity supply.
www.masterproducts.es

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido