Commissioning; Installation Site And Room Size; Putting Electrical Appliance Into Operation - EURANEG ALOAIR 20001 1 Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

Commissioning

7
This section contains information on the commissioning of the electrical device.
The purpose of commissioning the electrical equipment is to check its functions and
characteristics, as well as to detect and eliminate faults.

Installation site and room size

The AirCop should be mounted at a height of about 2m, centered on a wall and
should not be exposed to direct sunlight.
In principle, CO2 is very volatile and is distributed relatively evenly throughout the
room. The guideline value for an AirCop is the room size of approx. 75 sqm. This
specification refers to rectangular rooms. For rooms with a special cross-section,
such as a bay window, an L-shape, or many room dividers, another AirCop
should be placed in the less accessible area, if necessary.

Putting electrical appliance into operation

To put the AirCop into operation, the supplied power supply unit is connected to
the micro-USB port provided for this purpose.
Functional test:
After plugging the power supply to the device, it briefly lights up white and then
changes its color according to the current CO2 concentration in the room.
AirCop
20001.1
Original operating instructions
Commissioning
42 from 135
12/5/2020

Publicidad

Tabla de contenido
loading

Tabla de contenido