Descargar Imprimir esta página

Palram Yukon Serie Manual De Instrucciones página 11

Publicidad

IMPORTANT
Please
read
these instructions carefully before you start
to
assemble this
product
.
Please
carry
out the
steps
in
the order
set
out
in
these instructions.
Keep
these instructions
in
a
safe
place for
future
reference.
Safety Advice
For
safety purposes we
strongly recommend the product to
be assembled by at least
two
people.
Some parts may have sharp edges.
Please
be careful
when handling components. Always wear gloves,
eye
protection,
and long sleeves when assembling or
performing
any
maintenance
on
your product.
Do
not attempt to
assemble
the product
in
windy
or
wet conditions.
Do
not attempt to
assemble
the product if
you
are
tired,
have taken drugs,
medications or alcohol, or
if
you are
prone to dizzy
spells.
Dispose
of
all
plastic bags safely
-
keep
them
away
from children's
reach.
Keep
children
away from the assembly
area.
When using
a
stepladder
or
power tools, make sure that
you are
following
the manufacturer's safety advice.
Do
not climb
or stand on
the
roof.
Do
not
hang or lay on
the
profiles.
Heavy
articles should not
be leaned against
the
poles.
Keep
roof
and
gutters
clear
of
snow,
dirt
& leaves.
Heavy
snow load on the roof
can
make it unsafe to stand
below
or nearby.
Do
not
lean
against
or push
the product during construction.
Hot items such
as
recently
used grills,
blowtorches
etc.
must not
be
stored inside the product.
Note:
This
product
must
be
anchored
on
to
a
leveled surface and solid
foundation to
ensure
its
stability.
Make sure
that
screws and anchors are
compatible with foundation type.
Make sure
that there
are no
obstructions between the
assembly
area
and
the final position.
Cleaning Instructions
In
order to
clean
the product,
use
a
mild detergent solution
and rinse
with
cold
clean water.
Do
not
use
acetone, abrasive cleaners, or other special detergents to
clean
the
panels.
Clean
the product
once assembly
is
complete.
Before
Starting Assembly
Choose
your site carefully before beginning
assembly.
The
ground
surface must be
perfectly flat
and leveled and have
a
solid
base such
as
concrete,
asphalt, deck
etc.
Sort
the
parts and check against
the content
parts list.
Parts
should
be laid
out
close at hand. Keep
all
small parts (screws etc.)
in
a
bowl
so
they do not get
lost.
Please
consult your
local
authorities if
any
permits
are
required prior to constructing the product.
The
drawings
in
this manual
are
designed for 11'x
9'
shed + 4.1' Extension
Kit.
Please
note that content list
refers
only for 11'x
9'
shed.
Note:
All
the extension module
steps are marked
with
a
dashed
outline, should
be
performed during the
product's
assembly process.
If
you've purchased
Yukon
11'x17.2'oy
11'x21.3', you
will find the relevant assembly instructions
in
the Reinforcement
Kit.
Optional
Accessories
I
WPC
Floor Kit
Floor
Ex
ension
Kit
WPC
Floor Kit:
If you've purchased
the
WPC
Floor Kit
with the product,
relevant
steps
are
marked
with
these icons.
If
you've assembled the
product
without
the
floor
kit and wish to add one, please refer to the
relevant
steps (marked
with
these
icons)
in
the
assembly and perform
the
necessary
adjustments.
Utility
Shed
Shelf Kit:
If
you've purchased shelf
kits, it
is
recommended to insert
screws #411
inside the
profiles' tracks during the walls'assembly.
Vertical Bicycle Hanger:
Can
be
installed once the product
is
fully
assembled. Make sure the
bottom
wheel
is
at
floor
level.
During Assembly
(11
When
encountering the information
icon, please refer
to the relevant assembly step
for additional comments
and assistance.
This icon indicates
that
the installer should
be
inside the product.
Attention
This icon
indicates
that
the
installer should
be
outside
the product.
During assembly
use
a
soft surface below the parts to avoid scratches and damages.
Step
1: If
you've purchased
a
WPC
Floor Kit,
do not assemble profile #8851!
Step
8:
If
you're installing
a
WPC
Floor Kit,
measure and cut
floor
board
#
8912.
Step
18: Matte side
of
all
product's panels should
be
facing out!
Use
mild
soap
if
needed to
ease
sliding
of
profiles
&
panels.
Step 21:
It
is
recommended to insert
screws #411
as
preparation for mounting
shelves.
If
you've purchased
a
shelf
kit,
mount
a
maximum of
2
shelves per post.
If
you have purchased
the
Yukon Shed + Extension
-
go to the next step.
Step 22:
It
is
recommended to insert
screws #411
as
preparation for mounting
shelves.
If
you've purchased
a
shelf
kit,
mount
a
maximum of
2
shelves per post.
Step 31:
Before
inserting the
screws,
make sure
the internal
metal profiles
are
not protruding.
Step 32:
Before
inserting the
screws, make sure
the internal metal profiles
are
not
protruding
and
are
well
connected with one another inside the aluminum profiles.
Step 35:The sticker must
be
placed on
a
clean and
dry
surface.
Step 44: Slow down and
be careful when
sliding the
panels in.
Step 48:
Make sure the distance between the wall's
aluminum profiles
and
gutter
is
identical prior to
tightening the
screws on
the inside.
Step 65:
Make sure the shed
is
leveled prior to anchoring it to the surface
of
your choosing.
Use
suitable
screws and plugs (not supplied).
*Tighten
all
screws
when completing
assembly.
Do
not tighten
screws and
nuts
(411 &
466)
until completion
of
assembly
process.
These
2
icons
indicate if
screws'
tightening
is
required
or not.
Note: Anchoring
this
product to the ground
is
essential
to
its
stability
and
rigidity.
It
is
required to complete this stage
in
order for your warranty to
be valid.

Publicidad

loading