Installation Preparation; Stand Installation - Silvercrest SEK 2000 B2 Instrucciones De Utilización Y De Seguridad

Chimenea eléctrica
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 93

3. Installation preparation

Remove all packaging materials and all trans-
port bracing from the device.
Check the delivery contents for completeness
and any signs of damage.

4. Stand installation

After you have completely unpacked the device,
place it upside down on a clean surface so that
you can fully see the underside (Fig. 1).
1
Take a stand 5 and insert 3 screws 4 through
the holes (Fig. 2).
2
12
GB/IE/NI/CY/MT
There are 3 matching holes in each corner
of the device. Now take the stand 5 with
the screws 4 uand place it exactly over the
matching holes.
When the screws 4 are inserted in the correct
holes, tighten them with a screwdriver (Fig. 3).
3
Please proceed in the same way with all four
stands 5 until they have all been assembled.
The device can now be placed on its stands
5 . The device is ready for start-up (Fig. 4).
4

Publicidad

Tabla de contenido
loading

Tabla de contenido