Descargar Imprimir esta página

Motherboard Installation - ZALMAN Z9 NEO PLUS Guia De Inicio Rapido

Ocultar thumbs Ver también para Z9 NEO PLUS:

Publicidad

4
. Installation
Side Panel Removal

Motherboard Installation

M-ATX
M-ITX
There are 6 Stand-offs preinstalled. Please refer to the diagrams below for additional
Stand Off positions (based on motherboard type).
VGA Card Installation
Unfasten the Hand Screw holding the PCI Cover and disassemble the cover.
Remove the PCI Slot Cover. Install the VGA Card and fasten with a fixing screw.
5.25" Drive Installation
Front Cover Removal
4
ATX
PULL
ODD Installation
3.5", 2.5" HDD Installation
Install the Drive on HDD tray
then remove the HDD Tray as
Install the tray on the drive.
shown in the figure.
Install the Drive on HDD tray
Tip
※ When transporting an assembled system,
Please secure the HDD whte Bolt as shown
above
5
Bolt B
3.5" HDD
2.5" SSD/HDD

Publicidad

loading