Installation; Assembly - BRÖTJE ZLF 160 Manual Del Usuario

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 27
4

Installation

4.1

Assembly

Fig.2
Mounting the ZLF 160
7307960 - 03 - 15042020
1. Place the pipe section on the existing supply air pipe.
2. Place the 90° elbow on the pipe section.
3. Connect the air filter with adapter and support console to the 90 °
4. Adjust the height of the air filter with the adjusting screw on the
5. If necessary, secure the support console to the floor with screws and
1
2
3
4
RA-0001904
Danger of electric shock
Prior to commencing any installation work, isolate the boiler from
the power supply and safeguard against unintentional
reconnection.
elbow.
support console.
dowels (on site).
Important
Lubricant paste can be used for easier assembly of the individual
pipe sections.
Important
The air filter can also be installed optionally on the side supply air
connection
See
More informations on the supply air connections are in the
Installation Manual Eurocondense 400 kW - 610 kW .
en
4 Installation
13

Publicidad

Tabla de contenido
loading

Tabla de contenido