Craftsman CMXGZBF71243311 Manual De Instrucciones página 7

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Step 8: (fig. 8)
1. Screw a 1/4" nylock hex nut (26) all the way onto the
flow control link (44). Assemble the ferrule (46) onto
the link and then start a 1/4" nylock hex nut one or two
turns onto the link. See figure 8.
2. Assemble the ferrule (46) into the hole at the end of the
flow control lever (2) using a 1/4" nylock hex nut (26).
Tighten the nut, leaving it loose enough that the ferrule
can pivot. See figure 8.
3. Assemble the grip (43) onto the end of the flow control
lever. See figure 8.
Fig. 8
2
26
46
44
43
26
26
Step 9: (fig. 9)
1. Place the flow control lever into the slot in the hopper.
See figure 9.
2. Place the center brace (3) into the hopper. Insert a 1/4"
x 1" hex bolt (19) through the center brace and the front
of the hopper. Assemble a nylon washer (36), the flow
control lever and a 1/4" nylock hex nut (26) onto the
bolt. Do not tighten yet. See figure 9.
3. Insert the other 1/4" x 1" hex bolt (19) through the
center brace and the rear of the hopper. Assemble a 1/4"
flat washer (37) and 1/4" nylock hex nut (26) onto the
bolt. Tighten both the front and rear bolts. See figure 9.
Fig. 9
3
37
26
Step 10: (fig. 10)
1. Insert the 5/16" x 1-3/4" carriage bolt (18) up through
the slot and secure it with a nylon washer (36) and the
plastic wing nut (39). See figure 10.
2. Move the lift handle into the locked position as shown
in figure 10 and then tip the spreader back to rest on the
wheels and the rear of the hopper.
Fig. 10
ENglISh
19
19
36
26
39
36
18
5

Publicidad

Tabla de contenido
loading

Tabla de contenido