Starting Up The System - Daikin EKCB07CAV3 Manual De Instalación

Ocultar thumbs Ver también para EKCB07CAV3:
Tabla de contenido

Publicidad

4A From the rear
PCB
a
b
4C From the top
a
b
PCB
b
a
Notch this part for the wiring to pass through with nippers
etc.
b
Secure the wiring to the front part of the casing using the
wiring retainer and clamp.
5

Starting up the system

For instructions on how to configure and commission the system,
and hand it over to the user, refer to the installation manual of the
outdoor unit.
EKCB07CAV3
Control box for outdoor units with integrated hydraulic components
4P404075-1C – 2017.03
4B From the left
PCB
a
b
4D From the top centre
a
b
PCB
b
5 Starting up the system
Installation manual
7

Publicidad

Tabla de contenido
loading

Tabla de contenido