This booklet is a guide to rapid and easy use and maintenance of coffee machines.
Please read these instructions carefully. The company garantees that should any defect or problem
occur, it will provide its support through its Repair Service points.
Have your coffee machine inspected by qualified personnel at least once a year. This
constant care will make your machine safer and more efficient.
Our coffee machines have been designed and manufacured in complicance with all specifications that
distinguish traditional espresso coffee machines: noble materials such as copper and steel and reliable
components make alla machines made by the company safe, reliable and funciontal.
No liability can be accepted by the company for any damage to persons or things caused by non-com-
pliance with these instructions.
1) Remove the coffee machine from its parcking and check that it has not been damaged.
2) Place the appliance on a stable top, close to the mains sockets and water line connections.
Level the coffee machine by adjusting its feet. Check that the voltage of your mains supply corre-
sponds to that indicated in the technical specifications.
3) Remove the front tray and use the hose (3/8") provided to connect the machine inlet pipe to the
water purifier (use only pipes approved for potable water as required by Italian Ministerial Decree
21.03.73 and later amendments). Connect the outlet pipe by fixing it to the plastic tray (drainage)
(Photo 1). Switch on the water purifier and check for any leaks.
(Observe the rules issued by the relevant authorities for each state, region or county).
For optimal use of the appliance, check that the water supply pressure exceeds 1 bar (100 kPa) and
be less than 6 bar (600 kPa). If the incoming water pressure exceeds 6 bar, we recommend to use a
pressure reducer.
4) Electrical installation of the machine must be carried out exclusively by qualified personnel, ac-
cording to the instructions in this manual and the standards in force in the country of installation. The
machine comes with a suitably tested 2.5 m long H07RN-F 5x2.5 mm
must connect an EN 60309 approved 3P+N+PE 16A - 400V industrial plug (not provided). Another
type of power lead could be provided if required by the customer or local standards.
As an alternative the fitter may connect the power lead to an omnipole circuit breaker with character-
istics suitable for the electrical system involved, the standards in force in the country of installation and
IEC 60364-1. Before start-up the fitter must make sure the machine has been properly connected to
the electrical and earthing systems involved and check the efficiency of protection from direct contact,
as per IEC 60364-1.
IT IS STRICTLY FORBIDDEN TO USE THE MACHINE WITHOUT EFFECTIVE SAFE
EARTHING.
Carefully read the instructions above.
3. INTrODUcTION
4. INSTALLATION
power lead to which the fitter
2
A: Water intake into the boiler
B: Outlet pipe
8