Putting Into Operation - Seliger QUELLSTAR 2000 LED Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 35

PUTTING INTO OPERATION

PUTTING INTO OPERATION IN SOURCE STONES
The following illustration gives a total view of the water feature:
32
2
Please observe the following indications for putting into operation of the QUELLSTAR 2000 LED:
• The water supply hose must have a diameter of 2".
• The drilling hole of the source stone must have a diameter of 72 mm.
• We recommend to countersink the Quellstar 2000 LED min. 5 mm and max. 15 mm into the source stone.
• We recommend to use
• a pump with an adjustable capacity so you can regulate the fl ow of water and
®
• the fountain special regiles
to prevent formation of algae and to prolong the life span of the components.
ENGLISH
11

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

40240

Tabla de contenido