Installation
8.1
Spacing Allowances and Unit Dimensions
Key to fig. 2, page 3:
Item
Note
I
The blower and duct ring can be positioned either vertically or
horizontally; fig. 2, page 3 shows a Marine Climate System MCS5 with
blower rotated to vertical position.
Space allowances (fig. 2, page 3)
The following space allowances should be considered when mounting
the unit:
Allow a minimum of 152 mm around the perimeter of the unit in the
area of the seawater and condensate drain piping (1).
Allow a minimum of 76 mm of air space in front of the evaporator coil
for the return-air intake if it is adjacent to a bulkhead (2).
For flexible ducting connection (10) and for clearance needed behind
the supply-air grille
– allow 51 mm for the duct ring,
– allow 25 mm for the duct bend radius and
– add diameter of the ducting to get the total clearance distance.
Allocate enough space for installation and serviceability.
16
Description
1
Space allowance for return-air intake
(if adjacent to bulkhead)
2
Space allowance for seawater piping
3
Evaporator and condenser coil
4
Duct ring
5
Electric box
6
Rotary compressor
7
Refrigent connection
(allow space for access)
8
Seawater in
9
Seawater out
10
Total minimum clearance
11
Standard blower position as shipped
12
Possible drain position
MCS5, MCS15