Kohler Bancroft K-10579 Instrucciones De Montaje página 9

Ocultar thumbs Ver también para Bancroft K-10579:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Supply
Hose
7. Supply Connections
Connect the supply tubes to the supply stops. (Left is hot - right
is cold.)
Wrench-tighten all connections.
8. Installation Checkout
Connect the P-trap.
Ensure that all connections are tight.
Remove the aerator.
Open the drain.
Turn on the main water supply.
Check for leaks in the supply piping. Repair any leaks.
Open the hot and cold valves and run water through the spout
for about a minute to remove any debris.
Check for leaks in the drain piping. Repair any leaks.
Turn the valves off.
Remove any debris from the aerator and reinstall.
Kohler Co.
Supply
Stop
9
Spout
Aerator
1039582-2-B

Publicidad

Tabla de contenido
loading

Tabla de contenido