Pre-Installation; Planning Installation; Tools Required; Hardware Included - Glacier bay 1521US-24-262 Guía De Uso Y Cuidado

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Pre-Installation

PLANNING INSTALLATION

Before beginning assembly of product, make sure all parts are present. Compare parts with package contents list and hardware contents
list. If any part is missing or damaged, do not attempt to assemble the product.
Estimated Assembly Time: 40 minutes (24 hours for adhesive to dry).
TOOLS REQUIRED (NOT INCLUDED)
Phillips
Screwdriver
Power Drill
With Drill Bit

HARDWARE INCLUDED

NOTE: Hardware not shown to actual size.
AA
Part
Description
AA
Cabinet Base Screw
BB
Door Pull
CC
Touch-up Pen
Utility Knife
Measuring Tape
BB
Quantity
2
2
1
Adhesive
Level
CC
4

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

1004675601

Tabla de contenido