Descargar Imprimir esta página

Installation Instructions - Fortis BRERA 92690L0 Instrucciones De Montaje

Publicidad

Idiomas disponibles

Idiomas disponibles

English

INSTALLATION INSTRUCTIONS

Water Supply
Recommended
Maximum
Hot Water Temperature
65 C° (~150F)
80 C° (~175F)
Working Pressure
3 BAR (~45PSI)
5 BAR (~75PSI)
In case of pressures over 5 BAR (~75 PSI), we
Warning!, Do not force the screw (3.D).
recommend to use a pressure reducer.
Excessive tightening can affect the correct
Before proceeding with the assembly, purge the
function of the system or damage it. The
hot and cold water pipes so as to avoid the
thermostatic cartridge is equipped with a safety
accumulation of dirt and impurities that could
anti-scalding retainer set at 100°F (38°C). For
affect the function of the faucet.
higher temperatures push the button on the
adjustment handle. In case of hot or cold water
FIG. 01
pressure failure, the flow will automatically stop.
Remove with a screwdriver the protection covers
With a screwdriver loosen the stop cocks (3.H)
(1.A). Use the plug (1.B) if necessary.
in anti-clockwise direction.
FIG. 02
FIG. 04
Fit the faucet body to the wall with the shower
Remove the protection tape of the adhesive
outlet pointing upwards, connect the hot water
sponge (4.D) and apply it on the back of the
supply to the left inlet and the cold water supply
plate (4.C). Fit the sliding flat washers (4.B) and
to the right one.
(4.A) on the plate (4.C) and install it on the
The depth of the wall niche must correspond
thermostatic body till it is flush to the wall.
(wall coating included) to the tolerance given
by the MIN/MAX references given on the
FIG. 05
plastic cover (2.A).
Installing the control handle.
Once all connections have been carried out,
Proceed as follows for the upper part with the
activate the faucet at the working pressure
stopcock:
(we recommend maintaining the water flow
place the shim (5.N) and the insert (5.M) on the
for a few minutes so as to purge the system
rod of the screw-down valve, and fix using the
from any debris and/or dirt inside the piping).
screw provided (5.I), placing the washer (5.L) in
Temporarily remove the protection cover (2.A)
between. Place the handle (5.F) and tighten the
to check if there are leakages and if the system
grub screw (5.G), then insert the plate (5.H).
works regularly, reinstall the protection cover
Proceed as follows for the lower part with the
(2.A) and finish the external wall surface.
thermostatic cartridge:
tighten the pin (5.E) on the thermostatic cartridge
FIG. 03
rod and mount the handle (5.A), by placing
Remove the protection cover (2.A) as shown
the ring (5.D) in between, without moving the
in FIG. 02. With a screwdriver turn the stop
rod as this could affect the calibration of the
cocks (3.H) clockwise, loosen the fitting screw
cartridge. Tighten with the special grub screw
(3.D) using the proper wrench and pull out the
(5.B) and place the decorative plate (5.C).
test plug (3.E). Insert the o-ring (3.C) and the
FIG. 06
sleeve (3.B) on the thermostatic body. Fit the
o-ring (3.G) into the housing on the faucet body
Proceed as follows to replace the handle (6.A)
and assemble the protection cylinder (3.F). Use
alone:
a small quantity of the special grease included
remove the plate (6.B), unscrew the grub
to lightly lubricate the o-rings of the thermostatic
screw (6.C) and pull out the handle (6.A), both
cartridge (3.A). Insert the cartridge in the faucet
handles.
housing carefully aligning the positioning hole
Reassemble the new handle (6.A), fix it with the
with the housing of the fitting screw (3.D), then
grub screw (6.C) and then insert the plate (6.B).
tighten the latter.
FIG. 01
Minimum
15 C° (~60F)
0.5 BAR (~7PSI)
FIG. 03
FIG. 05
FIG. 02
FIG. 04
FIG. 06
FIG. 07
FIG. 08

Publicidad

loading