Water Connection; Connection To The Drain Line - Adler AC2-ELECTRONIC Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 98
Page. 8
E
V
Specification
Hardness
German degrees
English degrees
Parts per million
Residual Minerals
Set-up the site according the attached plumbing drawing.
Before connecting the equipment make sure that a gate valve has
been placed between the water supply and the equipment so that the
water can be turned off if required or for repair work.
Use a hose to connect the solenoid valve (E) to the gate valve (V) and
make sure that the delivery is not less than 20l/min.
Check that the temperature and water pressure correspond to
what is shown on the technical specifications plate.
If the water is harder than what is listed in the chart, it is advisable to
install a decalcifier upline from the solenoid valve.
If there are high concentrations of very conductive minerals in the
water, it is advisable to install a demineralization system calibrated to
the hardness shown in the following chart.
French degrees
Maximum
The machine with conveyor racks are continuously functioning and
therefore need particularly effective lowered drains.
Consult the separately provided installation diagram to position the
drains.
Connect the machine drains to the drainage system using pipes able
to withstand a constant 70°C temperature.
The floor discharge must be provided with a poultry stack.
It is possible to use the outlet tube and fitting
2.4
Da
f
°dH
°e
ppm
70
mg/l
2.5

CONNECTION TO THE DRAIN LINE

WATER CONNECTION

A
5
10
4
7,5
5
9,5
140
300/400
provided.
GB

Publicidad

Tabla de contenido
loading

Tabla de contenido