Descargar Imprimir esta página

EAntenna DX7M Guia De Inicio Rapido página 3

Publicidad

Idiomas disponibles

Idiomas disponibles

NO A ESCALA
NOT A ESCALE
How to check when you open the box, all
tubes are inserted in order and properly in
position only to hoist starting with the finer the
tip, matching the screw holes to put in each
section detailing.
In addition to inserting each Hose Clamp in
each sections that we correspond stop having
to save them afterwards when each screw is
inserted.
As you can see in the pictures, which does
not put Guying part the screw head DIN 912
is inserted into the outer tube or larger in
diameter so that the screw head press on the
down tube and lock so any movement caused
by force wind or hoist.
Where is signaled Guying part, once you have
identified each screw, you will see DIN 913 or
headless screw once inserted between 2
tubes with the respective arancelas indicating
the drawing screw the threaded ring DIN 582
to push it right up DIN 127 washer be straight
YES
NO
DIN 912
DIN 125
40X6mm
DIN 316
Guying point
DIN 127
DIN 913
DIN 125
M6 x 60mm
DIN 582
DIN 912
DIN 125
50X6mm
DIN 316
DIN 912
DIN 125
60X6mm
DIN 316
DIN 912
DIN 125
60X6mm
DIN 316
BALUN
DIN 9021
Antenna
DIN 934
Radials
ENGLISH
121,5cmX25mm
20-32mm
122cmX30mm
24-40mm
125cmX35mm
24-40mm
122cmX40mm
35-50mm
122cmX45mm
35-50mm
122cmX50mm
Feeding point

Publicidad

loading

Este manual también es adecuado para:

17890.07m3k