REBUILDING YOUR ATOMIZER
Take the bottom piece of your Bolt RDA (also known as the deck) and unscrew the
1.
post screws counterclockwise until all post holes are exposed.
Insert your first coil lead into one of the two negative posts (located on the outer
2.
ends) of the atomizer deck.
Tighten down the screw on the negative post with your screwdriver and insert the
3.
other lead into the positive post.
Next, insert the lead of the second coil into the opposing negative post on the
4.
opposite side of the first coil.
Tighten down the negative post screw. Insert the second lead into the positive post
5.
and tighten down the positive post.
Clip off all excess wire from the negative and positive posts.
6.
Screw your atomizer onto your device and pulse-fire the coils until evenly red from
7.
the inside out.
All manuals and user guides at all-guides.com