3. Locate Left Side Panel (E) and Right Side Panel (F),
insert one Wood Dowel (CC) into each of the
pre-drilled holes. Attach to the completed front panel
assembly and Hearth/Base use Bolts (AA) and
Washers (BB) through the pre-drilled holes in the
mounting blocks.
HAND TIGHTEN ONLY.
Hardware Used
AA
Bolt
BB
Washer
CC
Wood Dowel
4. Insert one Wood Dowel (CC) into each of the
pre-drilled holes on the top edges of the Assembly
from step 3. Then locate Center Shelf (H) and lay
fi nished side up on top of completed assembly.
From the inside, attach Center Shelf (H) using Bolts
(AA) and Washers (BB) through the pre-drilled holes
in the mounting blocks.
HAND TIGHTEN ONLY.
Hardware Used
AA
Bolt
BB
Washer
CC
Wood Dowel
5. Insert one Wood Dowel (CC) into each of the
pre-drilled holes on the completed assembly. Attach
Upper Side Panels (I, J) to the completed
assembly from step 4. Make sure that dowels are
seated into the pre-drilled holes. Using Bolts (AA)
and Washers (BB)attach them through pre-drilled
holes in the mounting blocks.
HAND TIGHTEN ONLY.
Hardware Used
AA
Bolt
BB
Washer
CC
Wood Dowel
All manuals and user guides at all-guides.com
x 8
x 8
x 4
x 5
x 5
x 4
x 4
x 4
x 4
5
Fig. 3
BB
AA
F
Fig. 4
H
CC
BB
AA
Fig. 5
AA
J
BB
CC
E
CC
CC
I