Uline H-2533 Instrucciones De Montaje página 4

Ocultar thumbs Ver también para H-2533:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6. Place the bottom (6) in the bottom lances of the shelf
adjustment strips. The flange with two holes should
face the front, and it should hang over the sill. Bolt to
the sill with two bolts and nuts. (See Figure 5)
Figure 5
6
7. Insert partition (7) into the cabinet. Align the two top
and two bottom holes in the partition with the holes
in the top of shelf and bottom of cabinet. Attach with
bolts and nuts. (See Figure 6)
NOTE: Bolts should be inserted from the top
downward.
Figure 6
7
8. Attach a coat rod bracket (9) beneath the left side
of the shelf with a nut and bolt. Repeat step to
attach right bracket (9). Insert coat rod (10) into holes
in bracket. (See Figure 7)
PAGE 4 OF 15
ASSEMBLY INSTRUCTIONS CONTINUED
Figure 7
9
10
9. Insert the four partition shelves (11) as desired into
the right side of cabinet.
10. Attach the doors (12 and 13) to the unit by placing
the door on hinges, aligning the holes, and using a
hammer to tap the hinge pins (14) into place with the
side of a screwdriver. (See Figure 8)
NOTE: If having issues with doors aligning, it
may be due to cabinet not sitting level. Use
included nut driver to adjust leveling feet in
bottom front two corners. Nut driver should
insert through inside of cabinet down into feet
and adjust as needed.
Figure 8
14
12
13
1120 IH-2533

Publicidad

Tabla de contenido
loading

Tabla de contenido