2-4. NEOLIUM LINE 200/250 and 300 4.00m platform assembly
• Closely follow the whole of §2 to assemble the NEOLIUM 200/250 and 300 2m platform.
• Assemble the 2 x 2.00m extensions by following § 2-1-5.
• Mount the platform with the hatch on rung no. 15 by following § 2-1-6.
• Mount the 4 braces on rungs no. 17, and then no. 19, by following § 2-1-7.
• Position the toeboards by following § 2-1-8.
2-5. NEOLIUM LINE 200/250 and 300 5.00m platform assembly
• Closely follow the whole of §2-3 to assemble the NEOLIUM 200/250 and 300 3m platform.
• Assemble the 2 x 2.00m extensions by following § 2-1-5.
• Mount the platform with the hatch on rung no. 19 by following § 2-1-6.
• Mount the 4 braces on rungs no. 21, and then no. 23, by following § 2-1-7.
• Position the toeboards by following § 2-1-8.
106-A000035565 - ind.D - 11/2021
67