3. Insert two bolts with
split washers into
lined-up bolt holes
and hand tighten with
washers and nuts to
secure. Repeat for
opposite side. Once
secured, use wrench
to tighten. (See Figure 3)
4. On second gravity
roller section, line
up steel angle holes
with H-stand. The
steel angle should
overhang the H-stand.
Place gravity roller on
top and line up bolt
holes. Insert two bolts
with split washers into
lined-up bolt holes
and hand tighten with washers and nuts to secure.
Repeat for opposite side. Once secured, use
wrench to tighten. (See Figures 4-5)
Gravity
Roller
Steel Angle
H-Stand
PAGE 2 OF 6
INSTALLATION CONTINUED
Figure 3
Steel
Angle
Figure 4
Gravity
Gate
Roller
H-Stand
Figure 5
1-800-295-5510
5. Lift gate lever to lower gate onto steel angle.
(See Figure 6)
Figure 6
uline.com
Gate Lever
0621 IH-6907