Make sure that pipes and wires are connected.
Make sure that liquid side valve and air side valve both are completely open.
1. The connection of power source
Connect the wire to independent power source socket.
Preparation of remote controller.
Run the air-conditioner in cooling operation mode for 30 minutes or longer.
2. Performance evaluation
Test the out and in air temperature.
Make sure whether the outlet air temperature subtract from inlet's gives more than 10°C.
Please check the following attach carefully, if part attach isn t useful, please take care of it.
Packing list of the indoor unit
NO.
Name
1
Indoor unit
2
Remote controller
3
Instructions
4
Batteries
5
Drain pipe
Packing list of the outdoor unit
NO.
Name
1
Outdoor unit
2
Connection pipe
3
Plastic strap
4
Pipe protection ring
5
Luting (putty)
This product is designed and corresponds to all European directives and requirements.
TEST RUNNING
PACKING LIST
Unit
Quantity
Set
PC
PC
PC
PC
Unit
Quantity
Set
PC
ROLL
PC
PACKET
16
Discharged air
1
1
1
2
1
1
2
1
1
1