Installation Instructions - V-TAC VT-511-S Guia De Inicio Rapido

Tabla de contenido

Publicidad

EN

INSTALLATION INSTRUCTIONS

1. Jumper cap switching posi�on has the func�ons of AC/DC (Maintained) and DC (non-maintained).
P1 is AC/DC posi�on, P2 is DC posi�on. (Refer to Picture F)
2. Take out the emergency ligh�ng from the package carefully, open the light according to the
manual. LEAD wire to PCB AC and green terminal, sheathe the accessory to emergency ligh�ng. (Refer
to Picture B)
3. Install the light on the wall according to the manual, the wire from green terminal be plugged into
the power supply of AC 220-240V.
OPERATION
1. If the AC power is normal, the green charging indicator is ON which shows the lamp is charging.
2. If power failure occurs, the emergency light senses the AC power failure and automa�cally switches
to emergency mode. The emergency light will illuminate for a minimum of 5 hours. When the AC power
is restricted, the emergency light switched the system back to normal mode and resumes ba�ery
charging.
MAINTENANCE
Use a small co�on swab with cleaning alcohol to clean the unit, never use strong or vola�le
chemicals to clean the unit as it will damage the plas�c parts. (Refer to Picture F)
F
P1
Jumper Cap
5
P2

Publicidad

Tabla de contenido
loading

Tabla de contenido