WARNING: For your safety, read and understand instructions completely before starting installation. Before wiring to power supply,
turn off electricity at the fuse or circuit breaker box.
NOTE: Juno recessed fixtures are designed to meet the latest NEC requirements and are listed in full compliance with the relevant
UL standard(s). Before attempting installation of any recessed lighting fixture, check your local electrical building code. This code sets
the wiring standards and installation requirements for your locality and should be understood before starting work. Use of non-Juno
trims voids Juno warranty.
SAVE THESE INSTRUCTIONS
Juno Type IC fixtures are designed for direct contact with insulating materials
which are approved for this application, including spray foam (Fig. 1).
Fixtures may also be used in non-insulated ceilings.
Juno Air-Loc LED housings are supplied with pre-installed gaskets for energy
savings and to comply with energy code air leakage requirements per ASTM
E283.
NEW CONSTRUCTION INSTALLATION
Step 1. Extend bar hangers to fit between joists. Bar hanger foot is
contoured to easily align with bottom of joist (Fig. 1). Position fixture by
into joists (Fig. 2).
hammering Real-Nails
®
Step 2. Slide housing along bar hangers into desired location. Use locking
screws or slot to secure (Fig. 3).
Relocating Housing – Nail can be removed with hammer claw to allow
easy repositioning of fixture without damaging bar hanger or nail (Fig.
4).
Step 3. Provide electrical service according to national and/or local
electrical code to the junction box located on the enclosure (Fig. 5). Supply
wire insulation must be rated for at least 90°C.
Step 4. A precise hole is required for mounting of this fixture. Cutting along
the ID of the mounting housing will provide an accurate hole. After cutting of
the hole, proceed with installation step 6.
SUSPENDED CEILING INSTALLATION
Step 1. Locate center of proposed opening on ceiling tile and cut a 2 5/8"
hole. An accurate hole is critical for fixture mounting, a 2 5/8" hole saw is
highly recommended.
Step 2. Place ceiling tile in T-bar grid.
Step 3. Place enclosure into position and snap bar hanger foot with integral
T-bar notch onto T-bars (Fig. 6). Lock in place. Additional holes are
provided for securing with wire or screws if desired.
Step 4. Provide electrical service according to national and/or local
electrical code to the junction box located on the enclosure (Fig. 5). Supply
wire insulation must be rated for at least 90°C.
Step 5. A precise hole is required for mounting of this fixture. Cutting along
the ID of the mounting housing will provide an accurate hole. After cutting of
the hole, proceed with installation step 6.
ELECTRICAL CONNECTION INSTRUCTIONS
Step 6. Remove the wiring compartment cover from the 2LEDDRIVER
fixture. Electrical service connected in the junction box feeds into the
housing through a whip with a conduit connector already attached.
Remove one knock-out and fasten provided conduit connector to wiring
compartment (Fig.7).
Step 7. Strip supply wire 3/8" and insert each supply wire into
appropriate connector. Connect black fixture wire to hot, white fixture
wire to neutral, and green fixture wire to ground. Connect violet (+) and
gray (-) dimmer wires, (MVOLT models only).
Step 8. Place all wiring and connectors back in wiring compartment and
replace cover, taking care not to pinch any wires.
1300 S. Wolf Road • Des Plaines, IL 60018 • Phone 800-323-5068 • Visit us at www.acuitybrands.com/juno-recessed
©2017 Acuity Brands Lighting, Inc.
INSTALLATION INSTRUCTIONS
Rev 1/19
P6167
TYPE IC FOR INSULATED CEILINGS
Figure 1
Figure 3
Figure 5
Knockout
Figure 7
Figure 2
Figure 4
Figure 6
Conduit Connector
1 of 2