Free Room; Installation - Zanotti DB1-DBO121 Manual De Uso Y Manutención

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

6.4 Free room

When installing the unit leave enough free room to allow opening, correct use and easy maintenance in safe
conditions.

6.5 Installation

Place the condensing unit on the floor.
Install the evaporator as follows:
A) Drill the holes in the ceiling keeping the necessary distance from the wall 140 cm.
B) Please select the matching cable length for sensor cables and power cables between the evaporating unit
and the condensing unit. (The length must be equal to the length of the pre-charged pipe for the models
SPO/GS and standard length of 10 meters for the models DBO/DBS up to the model 135).
C) Fit a drain line to the condensate water drain connection in the lower part of the evaporator.
Mod.
DB4
DBO 140
DB5
DBO 235
DB6
DBO 335
DB7
DBO 340
A
B
540
605
540
965
540
1370
540
1520
Mod
DB1 - DBO121.123
DB2 - DBO221
DB3 - DBO135
260
B
C
260
663
260
1083
250
1663
A
27

Publicidad

Capítulos

Tabla de contenido
loading

Productos relacionados para Zanotti DB1-DBO121

Este manual también es adecuado para:

Db1-dbo123Db2-dbo221Db3-dbo135Db4-dbo140

Tabla de contenido