Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 91

Calibration

When should the tool be calibrated?
every morning before starting work
when moving to another building site
when working with a different material (PVC instead of TPO or vice-versa, thinner or
thicker waterproof membrane)
change from 110V to 230V or vice-versa
change of generator (USA, CAN) or transformer (UK)
Ensure that the project parameters are set correctly (waterproof membrane
material and thickness).
Only use material for calibration which has been defined for the current project.
Calibration process
1.
Use the calibration template and place an isoweld
for it (A).
2.
Push the calibration template on to the corner of the waterproof membrane (B).
3.
Place the inductor into the calibration device and ensure that it is positioned cor-
rectly (C): the arm (D) to the inductor must be resting in the recess (E) provided.
A
4.
Press the
L
5.
Press the
OK
6.
You are now in the calibration program.
7 .
Press the start button (2).
8.
The automatic calibration is completed when there is a beeping sound
for 1 second and the display returns to standard view.
The tool is now calibrated.
B
or
button to move to CALIBRATION.
M
button to open the calibration program.
plate into the recess provided
®
E
C
D
39

Publicidad

Tabla de contenido
loading

Tabla de contenido