1
Upgrading the LAN overvoltage protection
Fig. 1: Localising the Ethernet over-
voltage protection
Top hat rail for installing the over-
1
voltage protection
2
Cable clamps
Scope of delivery
1 Ethernet overvoltage protection
1 patch cable
Installation manual [multi-language]
Check the equipment included
1. Inspect the component thoroughly.
2. Immediately notify the shipping company in case of the following:
– Damage to the packaging that indicates that the component may have been
damaged
– Obvious damage to the component.
3. Send a damage report to the shipping company immediately.
4. The damage report must be received by the shipping company in writing within
six days following receipt of the component. We will be glad to help you if ne-
cessary.
LAN overvoltage protection on blueplanet 87.0-165TL3
1
2
Fig. 2: Clamp in Ethernet overvoltage
protection
1
2
I
II
III
Patch cable
Ethernet SPD module
1
2
Page 3