Hardware Contents - LF allen + roth 9012SSMV Instrucciones De Montaje

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

HARDWARE CONTENTS

Description
Part
AA
Threaded Inserts
BB
Large Screws
CC
Rubber Collars
WARNING AND CAUTIONS
Before cutting, drilling or hammering into any wall surface, verify the location of electrical, plumbing and gas
lines. Cutting any of these may cause serious injury. If needed, contact your electrician, plumber or service
person.
PREPARATION
Before beginning assembly of the product, make sure all parts are present. Compare parts with package
contents list and diagram above. If any part is missing or damaged, do not attempt to assemble or install the
product. Contact customer service for replacement parts.
Estimated Assembly Time: 20 minutes (We recommend two people for assembly)
Tools Required for Assembly (included) : Hex Wrench
Tools Required for Assembly (not included) : Phillips Screwdriver and Hammer
Quantity
4
4
8
2
Picture
(Shown to size)
IS9112-I4

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

0045177

Tabla de contenido