Installation Of Drive Unit And Rail; Rail Assembly - Yale powr 600 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 75

4. Installation of drive unit and rail

Requirement:
You need at least a lintel height between min 35 mm and max. 400 mm to install the operator
correctly.

Rail assembly:

C
A
B
Put trolley „C" into the rail and connect the 2 rail pieces „A" with the connector piece„B" to a
complete rail
E
B
D
Move tension screw„D"through the hole of the tension bracket and fix it with shock absorber
spring and nut„E"
Tension the belt with nut„E"according to below drawing.
6

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Powr 800Powr 1000

Tabla de contenido