How To Install
STEP 3: REMOVE EXTENSION
TOOLS NEEDED:
Flathead screwdriver
1. Remove the adjustment rods and plugs from the
upper and lower side of the gate you are removing
the pre-installed extension from. You may need to use
a flathead screwdriver to remove the plugs.
2. Remove the pre-installed extension by pulling out the
upper and lower extension adapters away from the
gate. Store the extension in a safe place in case you
move the gate to a wider opening in the future.
3. Reinsert the plugs and adjustment rods you removed
earlier back into the gate. Please be sure the slot on
the plug is facing down towards the floor. Adjustment
rods slide into the plug holes. They DO NOT screw.
8
1
Bottom plug
2
3
Slot
STEP 4: INSTALL WALL CUPS
TOOLS NEEDED:
• Drill
• Phillips screwdriver
• Pencil
1. Ensure the wall cups are on the end of 4 adjustment rods.
2. Temporarily place the gate where you want to install
it, flush against the floor. Pull the adjustment rods out
until they reach the walls and trace the position of
each wall cup with a pencil.
3. Retract the adjustment rods and set the gate
aside for now.
4. Hold the wall cup in position and mark the center
with a pencil. Then put the cup aside.
5. Determine whether there is a stud behind the drywall
where you will install each wall cup. Proceed to either
6a or 6b.
PLEASE NOTE: The gate should be resting on the
floor. DO NOT allow a gap of more than 0.196" (5mm)
between the gate and the floor.
How To Install
2
4
Gate
Floor
9