Nozzle Pressure Check (Pi); Liquid Gas Operation Control; Operation Control; Introduction To Users - Diamond F15G/M Instrucciones Para La Instalación, El Uso Y El Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

2.8.2

NOZZLE PRESSURE CHECK (PI)

The pressure socket is located above the nozzle holder.
The silicone rubber is prepared for high temperatures and should be protected with tin foil to avoid its burning.
2.8.3

LIQUID GAS OPERATION CONTROL

Check whether the fitted nozzles comply with the indications on Table II.
Check whether the incoming pressure complies with the indications on Table II.
Make sure that the L.P.G. gas system has two pressure regulators of suitable capacity and that the evaporation capacity is sufficient.
See also the publication "Installation Regulations and Characteristics of L.P.G. Systems".
2.9

OPERATION CONTROL

- Start the unit in accordance with the use instructions Chap. 5.
- Make sure there are no leaks following the local procedures.
- Check the ignition and interignition of the pilot burner and the main burner.
- Make sure the flue gases are discharged regularly.
- Write on a sticker to be glued to the unit label, for what gas and pressure the unit has been calibrated.
2.10

INTRODUCTION TO USERS

Explain the operation and use of the Fryer to its user by consulting the manual, and illustrate any changes.
Leave this instruction manual with the user and explain he/she must consult it for any future reference.
GB
- 20 -

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Gf15s

Tabla de contenido