Cadet The Com-Pak CBC132TW Guia Del Propietario página 2

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

READ ALL
INSTRUCTIONS
AND SAFETY
INFORMATION
IMPORTANT!
It is extremely
important you verify
that the electrical
supply wires are the
same voltage as the
heater (240 volt
heater to 240 volt
power supply). If
replacing an existing
heater, check the
labels of the old
heater and replace
using the same
voltage. Hooking a
240 volt heater to a
120 volt power supply
will drastically
reduce the heater's
output. Hooking a 120
volt heater to a 240
volt power supply
will destroy the
heater.
Connecting your
heater to an
incompatible power
supply will void the
warranty.
P.2
PLACEMENT:
Install the Com-Pak Bath Heater (Model CB) vertically. Heater is not approved for horizontal or ceiling
mount applications.
CONTROLS:
A built-in single pole thermostat and 60 minute timer. (Note: Do not use with a wall thermostat).
How do I install for
new construction?
Mount The Wall Can
STEP 1
The CB Series heater REQUIRES A MINIMUM distance
of 6 inches from adjacent surfaces and 4
the floor. However, Cadet RECOMMENDS 12 inches
from all adjacent surfaces and 12 inches above the floor
for longer and cleaner performance. Heaters must be
spaced at least 3 feet apart.
Secure the wall can to the stud with 2 screws (See
Figures 1 & 2). As an option, the rubber shim provided
may be attached to side of wall can to square the wall
can to the stud.
Figure 1
Face of wall can must extend
/
inch or
1
2
stud to allow for thickness of
sheetrock.
Figure 2
Attach wall can to stud with
screws through holes provided
in wall can.
Connect Supply Wires
STEP 2
Route the supply wire from circuit breaker to heater.
Remove a knockout and attach the supply wire with a
strain relief connector, leaving 10 inches wire lead for
later use. Connect supply ground wire to grounding
pigtail in wall can (See Figure 3). Proceed to PART
TWO.
Installation Instructions
Part One
How do I install in
an existing wall?
STEP 1
Cut a hole 8 inches wide by 10
/
inches from
1
wall stud. This heater REQUIRES A MINIMUM distance
2
of 6 inches from adjacent wall surface and 4
from the floor. However, Cadet RECOMMENDS 12 inches
from all adjacent wall surfaces and 12 inches from the
floor (See Figure 4).
/
inch from face of
5
8
Route supply wire from circuit breaker directly to heater.
Remove a knockout and attach the supply wire with a
strain relief connector, leaving 10 inches wire lead for
later use (See Figure 3). Connect supply ground wire to
grounding pigtail supplied in wall can.
STEP 3
Insert wall can into opening; keeping wall can flush with
wall surface. Secure can to wall stud with 2 screws
through holes provided in can.
Proceed to PART TWO
Figure 3
Proceed to Part Two
Cut Hole In Wall
1
Figure 4
Model CB
Connect Supply Wires
STEP 2
Mount The Wall Can
/
inches high next to a
4
1
/
inches
2

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

The com-pak cb132t

Tabla de contenido