Initial Setup - Drucker Diagnostics HORIZON 6 Manual Del Operador

Ocultar thumbs Ver también para HORIZON 6:
Tabla de contenido

Publicidad

Idiomas disponibles
  • ES

Idiomas disponibles

  • ESPAÑOL, página 16
I
S
NITIAL
ETUP
o Unpack and verify that all the following are included:
o Setup the centrifuge on flat and level surface. A bench top clearance height of 21" (54 cm) is required to open
the lid.
o The centrifuge should have 6" (15 cm) of clear space around the centrifuge. Proper ventilation is necessary to
prevent the overheating of samples as well as premature failure of the centrifuge. Choose an area which allows
unencumbered air flow, and where the temperature remains between 16°C and 32°C.
o No hazardous material shall be permitted in the clearance envelope during operation.
o The operator time within the envelope shall be limited to the time necessary for loading, unloading, and
centrifuge operation only.
o Plug the line cord into the centrifuge.
o Plug the line cord into an approved electrical outlet.
B
E SURE THE ELECTRICAL OUTLET IS ALWAYS ACCESSIBLE AS THE LINE CORD IS THE MEANS OF EMERGENCY
D
!
ISCONNECTION
Centrifuge
Power cord
Tube holders
Operating manual
Drucker Diagnostics | +1-814-692-7761 |
CustomerService@DruckerDiagnostics.com
| 4

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Horizon 6faHorizon 12Horizon 24

Tabla de contenido